November Minutes 2019


PEWAUKEE RIVER PARTNERSHIP

Pewaukee Public Library 

11/21/2019   6:30 PM

 Attendance:  C Shong,  R Schwabe, L Deppe, N Koepp,  J Willis,  P Evert

The Minutes  of 10/24 /19 were approved as read.

Treasurer Report,   Balance is $ 13,192.92. Charlie requested $137.55 reimbursement for welding wire and platform fittings


Old Business: 

Clark street bridge railings.  The old railings were removed in order to do the fitting of the new railings.  The old railings were then put back in place. Luke has finished the letters using the plasma cutter at the school. After welding the letters in place painting and finishing will need to be completed.  We need a heated space 6’ x 24’ to do the painting of the railings due our early winter.  Call Charlie at 262 443-6737 if you have such a space we can use.

Bridge Electrical. The Electrical work is complete.

PHS Scholarship:  No determination has been made for a Scholarship.

Bridge Decorations.  Evergreen boughs have been installed in the flower boxes. It was suggested that red bows be added.

Platforms. The donated platforms have been installed at Kiwanis Park.

New Business:  Projects for 2020:

Koepp park benches.  Bench placement is an issue at this time.

River Run Canoe take out.  A take out at Riverwood Dr. is a possibility and is being looked into.

Paul Evert proposed the addition of a Flower Box and a light pole, on the south side of the West ramp.  The box and pole will be similar to the other boxes and poles.  Motion passed.

A proposal for a (bank) water terrace rearrangement south of Oakton was made. This is being proposed to increase water flow during high water periods. The project is listed in our River Management Plan.

Ray Schwabe


The meeting was adjourned at 7:55 pm.





No comments:

Post a Comment