November Minutes 2018


PEWAUKEE RIVER PARTNERSHIP

Pewaukee Public Library

Minutes of 11/15/2018   6:30 PM

Attendance:  C Shong,  P Evert,  R Schwabe,   L Deppe,  J Willis,    

 Minutes of 9/20/2018 were approved.

Treasurer Report, Balance is $ 8,724.24

Old Business: 

A renewal of the liability insurance (during construction) was discussed.  This would extend the insurance for small projects that are being finished. We will look in to a reduced amount.

Electrification of the PVH bridge.  Discussions were held with contractors on the possible approaches for underground boring from the village light pole. Once we have the numbers from the contractors, we can decide on solar vs power from the grid. Jim Siepmann asked that we wait before we make a decision since he is working with the new developer on a path from the bridge to the road. We may be able to hookup from that direction.

The Galilee project report.  The Galilee church group cut what amounted to 9 loads of brush that was hauled away by  PRP.  The cutting was done along the Pewaukee river at the village park.  Thank you for your great job.

New Business:

The Simmons woods bulletin board.  The site needs some attention such as new window and information update.  A meeting at the site will be scheduled.  The meeting will be on an “on call” basis.

The meeting was adjourned at 7:25 PM.

Ray Schwabe